1, Checking the machine rack before power on machine, whether there is anything in rack gear and guide.
2 check the water level of the vacuum pump every day and keep the water level
3, the machine spindle pump must add 000# grease
4, grease in row drilling bag, add 5CC grease every five days, use row drill special butter
5. Clean the rack, guide rail and Z shaft screw at the end of each day and spray rust remover
6 clean the guide rail every day, and press the grease pump to lubricate the guide rail. The fingers touch each rail, and the fingers have grease and grease in place
7 vacuum pumps clean up and replace water every week
8, winter boot press F4, row drill bag preheated 4-5 minutes
9 after the end of the daily work, should clean up the distribution cabinet and internal electrical parts, avoid causing short circuit and cause electric fire!!!